Solar System Overview
Estimate Your Savings and Connect with a Solar Expert
Commercial
Residential
Solar Panel Calculator (Residential)
About Us
Elios Energy Systems Pvt. Ltd. was founded in 2017 in Ahmedabad by a dedicated two-person team with a clear mission: to make solar energy accessible, reliable, and affordable for all. Since then, we’ve transformed from executing 50 kW pilot projects to delivering end-to-end EPC (Engineering, Procurement, and Construction) solar solutions across India. As of March 2023, we were officially incorporated as a private limited company, solidifying our commitment to sustainable energy solutions .
To date, we’ve successfully completed over 3,000 projects, serving a diverse clientele that includes residential homes, industrial facilities, municipalities, and utility-scale solar parks. Our expertise spans the entire project lifecycle, from design and procurement to installation and maintenance.
Our Services
Residential Solar EPC Projects
Commercial Solar EPC Projects
Industrial Solar EPC Projects
Captive Power Plant Solutions
Solar Park Development Services
Design & Consultancy for Solar Projects
Our Products
Solar Power Systems
On-Grid Solar Power System
On-Grid ₹55,000 – ₹60,000 / kW
Off-Grid Solar Power System
Off-Grid ₹62,000 – ₹66,000 / kW
Hybrid Solar Power System
Hybrid ₹70,000 – ₹74,000 / kW
Solar Component
Solar On-Grid Inverter (3 kW–50 kW)
Inverter ₹15,000 – ₹3,20,000 Unit
Solar Battery (24 V, 150 Ah)
Batteries ₹9800 unit
Solar Lighting
Solar Street Light (30 W–100 W)
Street Lights ₹3,300 – ₹1,5000 Unit
Solar Cleaning System
Cleaning ₹2,200 – ₹4,800 Unit
Solar Cable
Cables ₹13 – ₹28 / meter
FAQs
What types of solar systems does Elios Energy Systems offer?
We specialize in turnkey EPC solutions across three main system types:
-
- On-Grid Systems with net-metering for homes, commercial rooftops, and industrial facilities.
- Off-Grid Systems featuring Li-ion battery backups for remote or unreliable grid locations.
- Hybrid Systems combining grid-tie and battery storage to ensure uninterrupted power supply.
How long does the end-to-end installation process take?
- Residential (3–10 kW): Typically 4–6 weeks from site survey to commissioning.
- Commercial (10–500 kW): Usually 6–10 weeks, depending on DISCOM approvals and site complexity.
- Utility-Scale (MW+): Project timelines vary; detailed Gantt charts are provided in the proposal.
Do you assist with government subsidies and approvals?
Yes. We manage all documentation and liaison with GEDA, MNRE, and local DISCOMs to secure maximum available incentives, including:
-
- Central and state-level capital subsidies.
- Net-metering or gross-metering approvals.
- Any additional local rebates or concessional financing schemes.



